Management

Delay Analysis & EOT Claim

  • Lectures 54
  • Quizzes 0
  • Duration 6:38:24
  • Language arabic
  • Reviews (36)
80$ 165 Student

.

Course Title

Delay Analysis & EOT Claim

Course Subtitle

Delay Analysis & EOT Claim Templates & FIDIC Clauses

Course Description

هذا المحتوى يخص كل المهتمين بتحليل التأخير فى المشاريع الانشائية والمطاليات الزمنية المبنية على اسس تعاقدية بشكل عملى باستخدام البريمافيرا والاكسل والوورد

What are the requirements for this course?

Primavera P6

Course Review

5

36 Reviews
5 Stars
86%
4 Stars
8%
3 Stars
6%
2 Stars
0%
1 Star
0%

Content

1
9 Lectures 00:52:13
Foundational Part

1 Lecture 1.1 Introduction to Claims
2 Lecture 1.2 Classifications of Construction Claims
3 Workshop 1
4 Lecture 1.3 Delay Analysis Methodologies
5 Workshop 2
6 Lecture 1.4 Disruption Claims
7 Lecture 1.5 Acceleration Claims
8 Workshop 3
9 Lecture 1.6 Construction Claims Strategies
2
20 Lectures 02:51:30
Delay Analysis Workshops using Primavera P6

1 Lecture 2.1 DA Requirements Check List
2 Lecture 2.2 DA Layout
3 Lecture 2.3 Understanding Constrains
4 Lecture 2.4 Open End Activities
5 Lecture 2.5 Understanding Calendar
6 Lecture 2.6 Dangling Activities
7 Lecture 2.7 Driving and Non Driving Relationships
8 Lecture 2.8 SS & FF With Lag (Ladder Activities)
9 Lecture 2.9 Save Baselines & Updates & DD
10 Lecture 2.10 Retained Logic VS Progress Override
11 Lecture 2.11 % Compete Physical
12 Lecture 2.12 Out of Sequence Activities
13 Lecture 2.13 Concurrent Delay
14 Lecture 2.14 Fragnets
15 Workshop-No-4 Impacted As Planned Analysis Ex.01
16 Workshop-NO5 Impacted As Planned Analysis Ex.02
17 Workshop-NO6 Collapsed As Built Analysis
18 Workshop-NO7 As Planned VS As Built
19 Workshop-NO8 Time Impact Analysis Part.01
20 Workshop-NO8 Time Impact Analysis Part.02
3
8 Lectures 01:09:12
Time Slice Windows Analysis Workshops

1 Lecture 3.1 Introduction to TSWA
2 Lecture 3.2 Delay Logic
3 Lecture 3.3 Procedures and Important Notes
4 Lecture 3.4 Fist Slice Procedures & Analysis
5 WS.09 TSWA Part.01
6 WS.09 TSWA Part.02
7 WS.09 TSWA Part.03
8 WS.09 TSWA Part.04
4
5 Lectures 00:15:54
FIDIC Clauses related to delays

1 Lecture 4.1 Introduction to FIDIC
2 Lecture 4.2 Commencement, Completion Dates
3 Lecture 4.3 Programme
4 Lecture 4.4 Extension of Time Clauses
5 Lecture 4.5 Claim Procedures
5
4 Lectures 00:22:49
Fully Detailed EOT Claim Templates

1 Lecture 5.1 EOT Claim Procedures
2 Lecture 5.2 ER Template (Case Study)
3 Lecture 5.3 Notice of Claim Template
4 Lecture 5.4 Detailed EOT Claim Template
6
8 Lectures 01:06:46
Disruption Analysis & Compensation Cost

1 Lecture 6.1 Disruption Definition
2 Lecture 6.2 Disruption Analysis Part01
3 Lecture 6.3 Disruption Analysis Part 02
4 Lecture 6.4 Disruption Analysis Part 03
5 Lecture 6.5 Compensation Cost
6 Lecture 6.6 MMA Case Study 1
7 Lecture 6.7 MMA Case Study 2
8 Lecture 6.8 MMA Case Study 3

Student Feedback

5

36 Reviews
5 Stars
4 Stars
3 Stars
2 Stars
1 Star

Sherif Sabri


Ahmed Maher Abd El megeed


AHMED SAAD


Ahmed Zakaria Mohamed Nader

محتوى الكورس ممتاز ودسم جدا ، ومهما كانت مهامك فى المشروع حتى لو مش خاصة بالمطالبات محتوى الكورس ده هيفيدك جدا فى نجاح المشروع استفدت جدا بالكورس ويستحق اكثر من خمس نجوم


Ali Arisha

كورس مفيد جدا جدا جدا والتطبيق العملى فيه اكثر من رائع . شغل ومجهود واضح فى المادة العلميه والمحتوى انصح به جدا جدا لاى حد مهتم بالموضوع شكرا جزيلا لحضرتك على الكورس الاكثر من رائع


Hesham Mahmoud Mohamed El Marghany

v.good


Hesham Galal


Mohammed Tarek Albaz


Mohammed Abbas


Mohamed Ahmed Elshony



Upload Your Course

Ali KATARY

Ali KATARY

Planning Force