Management

Delay Analysis and Claim Submittal

  • Lectures 67
  • Quizzes 0
  • Duration 6:56:15
  • Language arabic
  • Reviews (32)
39$ 193 Student

.

Course Title

Delay Analysis and Claim Submittal

Course Subtitle

Prospective, Forensic and Other Approaches to Analyze the EOT Claims

Course Description

The course covers the technical and legal points of view regarding the EOT claims. It also discusses the methods of delay analysis from different international perspectives. The components of EOT claim and a sample are included with cases of law and exercises.

What are the requirements for this course?

The basics of scheduling techniques and contractual language.

Course Review

4

32 Reviews
5 Stars
53%
4 Stars
38%
3 Stars
6%
2 Stars
0%
1 Star
3%

Content

1
6 Lectures 00:37:49
Types of Delay

Types of Delay and Consequences

1 Introduction
2 Delay and CPM
3 Delay Indicators
4 Delay Reasons and Revising the Schedule
5 Delay Consequences
6 Concurrency and Pacing
2
24 Lectures 02:55:45
Delay Analysis Methods - AACE

Delay Analysis: AACE RPs

1 Sec.2 Content and Ref.s
2 Prospective TIA
3 TIA Steps
4 TIA Flowchart and SCL
5 Forensic Schedule Analysis
6 Methods Classification
7 Choosing a Method
8 Principles and SVP
9 Baseline Validation
10 As-Built and Update SVP
11 Delay Events
12 Methods Implementation
13 MIP 3.1 Observ.-Static-Gross
14 As-Planned vs As-Built Example
15 MIP 3.2 Observ.-Static-Periodic
16 MIP Observ.-Dynamic
17 Windows Analysis Example
18 MIP 3.6-7 Modeled Additive
19 MIP 3.8-9 Modeled Subtractive
20 Collapsed-As-Built Example
21 Evaluation-CP and Float
22 Evaluation-Concurrency and Pacing
23 Evaluation-ECD and Acceleration
24 Purposes and Source Data
3
2 Lectures 00:08:25
Delay Analysis Methods - RICS

Delay Analysis: RICS Guidance

1 RICS Professional Guidance
2 RICS- Delay Analysis Methods
4
17 Lectures 01:51:14
SCL Protocol

Society of Construction Law Protocol

1 Sec.3 Content SCL
2 Change-Variation
3 Mitigation and Acceleration
4 EOT Claims
5 EOT and Compensation
6 Programme Preparation
7 Acceptance-Update-Revision
8 Prospective Delay Analysis
9 Analysis Steps
10 Assessment
11 Retrospective Analysis
12 Concurrent Delay
13 ERE after Completion
14 Compensation and Concurrency
15 Special Cases
16 Disruption
17 HO Overheads
5
4 Lectures 00:22:52
Delay Analysis Perspectives

Delay Analysis Categories and Source Data

1 Analysis Categories
2 Analysis Classification
3 Strength and Weakness
4 Delays and Source Data
6
5 Lectures 00:28:16
EOT Claim Submittal

Claim Submittal: Content and Sample

1 Why to Claim EOT
2 Claim Components
3 Special Cases
4 Claim Submittal
5 Example
7
9 Lectures 00:31:54
Extra Cases and Principles

Law Cases and Exercises

1 Dominant Cause of Delay
2 Concurrency Cases
3 Prevention Principle
4 Global Claim
5 Exercise no.1
6 Exercise no.2
7 Exercise no.3
8 Exercise no.4
9 Exercise no.5

Student Feedback

4

32 Reviews
5 Stars
4 Stars
3 Stars
2 Stars
1 Star

Mohammed Beasar


mohamed


Abdullah Saleh


MOHAMMEDABUSGRA ELFATIH ELMAM


Walid Refat Shawky Barakat


Mohamed Kamal

ممتاز


Hazem Khaled


محمد احمد

5 Star


Hazem Said Ebeid

Very great information gained from these lectures


Ahmed Samir Ali

The course offers an adequate overview of both AACE Recommended Practice and SCL delay and disruption protocol. It also discusses the different methods of delay analysis. on the other hand, a couple of complex examples especially on the TIA and windows analysis methods is needed to be added to the course. In conclusion, a very good and useful course.



Upload Your Course

M Maged Hegazy

M Maged Hegazy

Project Management Consultant