Management

Planning, Scheduling and Reporting Using Primavera P6 (PSR)

  • Lectures 124
  • Quizzes 0
  • Duration 22:46:17
  • Language arabic
  • Reviews (38)
80$ 143 Student

.

Course Title

Planning, Scheduling and Reporting Using Primavera P6 (PSR)

Course Subtitle

PSR Course

Course Description

فى هذا المحتوى سنتعلم كيفية عمل جدول زمنى باستعمال برنامج البريمافيرا والاكسل بالاضافة الى عمل تحديث على الجدول الزمنى ثم عمل تقارير المتابعة المناسبة

الكورس مكون من 6 اجزاء كالتالى

re-wrap; overflow-wrap: break-word; font-family: " segoe="" ui="" historic",="" "segoe="" ui",="" helvetica,="" arial,="" sans-serif;="" color:="" rgb(5,="" 5,="" 5);="" font-size:="" 15px;"="">
Part.01 Management, scheduling concepts (Knowledge):
Project Management
PE Responsibilities
Preparing BL Steps
Updating Steps
Schedule meth. & Tech.
Estimation Meth.
EVM in Scheduling
Cash Flow
Manpower Histogram
Part.02 Primavera P6 Basic Level:
P6 from Oracle Website
EPS & OPS & WBS
Project & Calendar
Activities
Resources
Resources Assignment
Cost Allocation
Updates
Group and Sort
Printing
Part.03 Primavera P6 Advanced Level:
Excel & Primavera
Activity ID Structure
WBS Code Structure
Resource Excel
Activities Excel
Cash Flow Excel
Manpower Histogram
Global Change
User Define
Advanced P6
Part.04 P6 Preparing Baseline:
BOQ & Documents
Activity List
Productivity Rates
Construction
Mobilization
Engineering
Procurement
Deployment Schedule
Sub-contractors
Testing & Commissioning
Part.05 Updating & Analysis:
Updates Requirements
Progress Tracking Sheet
Resources Tracking Sheet
Daily Report (Records)
Apply Actuals
Progress analysis
Expected Finish Date
Manpower Analysis
Issue Log
Part.06 Reporting:
Pie Chart
Bar Chart
Line Chart
Combo Chart
Dashboard
Performance Indicators
Narrative Report
Monthly Report
Weekly Report
Progress Presentation

What are the requirements for this course?

N/A

Course Review

5

38 Reviews
5 Stars
95%
4 Stars
5%
3 Stars
0%
2 Stars
0%
1 Star
0%

Content

1
17 Lectures 02:00:03
Part.01 Scheduling, Management Concepts (Knowledge)

1 PSR 1.01 Project Definition
2 PSR 1.02 Project Management
3 PSR 1.03 Project Management plan
4 PSR 1.04 Baseline Schedule Creation
5 PSR 1.05 Baseline Schedule Review
6 PSR 1.06 Schedule Methods & Techniques
7 PSR 1.07 Critical Path Method
8 PSR 1.08 Resources
9 PSR 1.09 Resource Leveling VS Smoothing
10 PSR 1.10 Schedule Compressing
11 PSR 1.11 Cash Flow & Cost Allocation
12 PSR 1.12 Baseline VS Updated Schedule
13 PSR 1.13 EVM Planned Value
14 PSR 1.14 EVM Earned Value
15 PSR 1.15 EVM KPIs
16 PSR 1.16 Earned Schedule Management
17 PSR 1.17 Three Point Estimation & PERT
2
35 Lectures 04:42:33
Part.02 Primavera Basic Level

1 PSR 2.01 Down load P6 from Oracle
2 PSR 2.02 P6 Setup
3 PSR 2.03 EPS
4 PSR 2.04 OBS
5 PSR 2.05 Project
6 PSR 2.06 Calendar
7 PSR 2.07 WBS
8 PSR 2.08 Workshop.01
9 PSR 2.09 Activities
10 PSR 2.10 Sequence between Activities
11 PSR 2.11 Activity Codes
12 PSR 2.12 Group and sort by Activity Codes
13 PSR 2.13 Filter by Activity Codes
14 PSR 2.14 Time Scale
15 PSR 2.15 Insert Resource List
16 PSR 2.16 Resource Assignment
17 PSR 2.17 Activity Cost
18 PSR 2.18 Cash Flow In P6
19 PSR 2.19 Resources Histogram in P6
20 PSR 2.20 Export & Import XER File
21 PSR 2.21 Level Resources
22 PSR 2.22 Activity Types
23 PSR 2.23 Group and Sort
24 PSR 2.24 Filter & Look ahead Schedule
25 PSR 2.25 Update requirements
26 PSR 2.26 Layout
27 PSR 2.27 EPS Structure
28 PSR 2.28 Maintain & Assign Baseline
29 PSR 2.29 Percent Complete Type
30 PSR 2.30 Update (Duration)
31 PSR 2.31 Update (Physical)
32 PSR 2.32 Filter Delayed Activities
33 PSR 2.33 Retained Logic VS Progress Override
34 PSR 2.34 Duration Types
35 PSR 2.35 Printing
3
24 Lectures 02:54:24
Part.03 Primavera Advanced Level

1 PSR 3.01 Activity ID Structure
2 PSR 3.02 WBS Code Structure
3 PSR 3.03 Inserting Activities Using Excel
4 PSR 3.04 Sequence Between Activities Using Excel
5 PSR 3.05 Resource Assignment Using Excel
6 PSR 3.06 Activity Codes Assignment Using Excel
7 PSR 3.07 Cost Allocation Using Excel
8 PSR 3.08 Manpower Histogram Using Excel
9 PSR 3.09 Planned Value Chart Excel
10 PSR 3.10 Schedule Comparison
11 PSR 3.11 Updating (Duration) Using Excel
12 PSR 3.12 Updating (Physical) Using Excel
13 PSR 3.13 Understanding Constrains
14 PSR 3.14 Open End Activities
15 PSR 3.15 Dangling Activities
16 PSR 3.16 Driving and Non Driving Relationships
17 PSR 3.17 SS & FF With Lag (Ladder Activities)
18 PSR 3.18 Out Of Sequence Activities
19 PSR 3.19 Equal At Completion Cost with Budgeted To...
20 PSR 3.20 Multiple Float Paths
21 PSR 3.21 Global Change
22 PSR 3.22 Activity Steps
23 PSR 3.23 WPS & Documents
24 PSR 3.24 Resource Curve
4
30 Lectures 09:40:35
Part.04 Preparing BL Using Project Documents

1 PSR 4.01 Scope of Work
2 PSR 4.02 BOQ
3 PSR 4.03 Activity List Part.01
4 PSR 4.04 Activity List Part.02
5 PSR 4.05 Activity List Part.03
6 PSR 4.06 Activity List Part.04
7 PSR 4.07 Activity List Part.05
8 PSR 4.08 Activity ID Structure
9 PSR 4.09 Productivity Rates
10 PSR 4.10 Resource & Duration Estimation P.01
11 PSR 4.11 Resource & Duration Estimation P.02
12 PSR 4.12 Resource & Duration Estimation P.03
13 PSR 4.13 Create Project & Configurations
14 PSR 4.14 Construction Work WBS
15 PSR 4.15 Activity Codes using Excel and P6
16 PSR 4.16 Insert Resource List to P6
17 PSR 4.17 inserting Activities & Codes & Duration &...
18 PSR 4.18 Check P6 Cost With BOQ Cost Part.01
19 PSR 4.19 Check Cost Part.02
20 PSR 4.20 Sequence Between Activities P.01
21 PSR 4.21 Sequence P.02
22 PSR 4.22 Mobilization, T&C, Closeout
23 PSR 4.23 Engineering Work
24 PSR 4.24 Procurement Plan Excel
25 PSR 4.25 Procurement Plan Primavera
26 PSR 4.26 Milestones List
27 PSR 4.27 Manpower Histogram
28 PSR 4.28 Cash Flow & Planned Values Chart
29 PSR 4.29 Deployment Schedule
30 PSR 4.30 Sub-Contracting
5
8 Lectures 01:38:35
Part.05 Updating, Analysis

1 PSR 5.01 Export WBS & Activities to Excel with lay...
2 PSR 5.02 Daily Report Template
3 PSR 5.03 Progress Tracking Sheet
4 PSR 5.04 Resources Tracking Sheet
5 PSR 5.05 Apply Actuals & Progress Analysis
6 PSR 5.06 Manpower Updating
7 PSR 5.07 Expected Finish Date
8 PSR 5.08 Issue Log
6
10 Lectures 01:50:07
Part.06 Progress Reports

1 PSR 6.01 Pie Chart Using Excel
2 PSR 6.02 Pie Chart PowerPoint & Excel
3 PSR 6.03 Colum & Bar Chart
4 PSR 6.04 Line Chart
5 PSR 6.05 Combo Chart
6 PSR 6.06 Dash Board
7 PSR 6.07 Narrative Report
8 PSR 6.08 Performance Indicators
9 PSR 6.09 Weekly Progress Report
10 PSR 6.10 Monthly Report

Student Feedback

5

38 Reviews
5 Stars
4 Stars
3 Stars
2 Stars
1 Star

ahmed yasir


Alaaeldin abdelmonsef saad


Sherif Sabri


Mohammed Abbas


rania


Ahmed Zakaria Mohamed Nader


Ahmed Fawzy


Arafa Said Zaki Mohammed


BAHER GALAL AMMAR

Great


Ahmed Albasry

I can't thank you enough Eng. Ali . Awesome course!



Upload Your Course

Ali KATARY

Ali KATARY

Planning Force